Tic-tac-toe re-designed as Game of the Ox

Terça-feira, 23 de Fevereiro del 2021
Chinese New Year was celebrated on February 12th. This 2021, according to zodiac animals, it was the year of the Ox. Based on this celebration, Thinking Room, a creative agency from Indonesia, created Game of the Ox.

This modified version of the popular tic-tac-toe board game was chosen for its concordance between the year of the Ox letters O and X that are also part of the board game.

The game comes in a very nice packaging and is made out of a pink and clear acrylic combination. One of the things we liked the most about this project is that the pieces can be used as decoration on a table, as incense holder or as a floral decoration holder.

Game of the OX.

Xs and Os

Game of the OX packaging.

Game of the OX top view.

Stacked Game of the OX boxes.

Game of the OX packaging.

Game of the OX stacked pieces.

Game of the OX as flower holders.

Game of the OX as incense holders.

Game of the OX packaging.



Project by
Thinking Room

Você poderia gostar também:

Brise by Wonho Lee

Brise by Wonho Lee

Brisé is a ballet movement whose curved posture serves as the inspiration for this award-winning fan designed by Wonho Lee.

product design

Adufe by 327 Creative Studio

Adufe by 327 Creative Studio

Adufe wine brand from the Beira Baixa geographical area by 327 Creative Studio.

Packaging wine

Rewind Collections

Rewind Collections

These clocks, inspired by the 80s aesthetic, were developed by David Fernández and Josep Prat Sorolla.

product design art

Brand design and packaging for Nopalera by Abby Haddican.

Brand design and packaging for Nopalera by Abby Haddican.

Nopalera: Resilencia es belleza. A brand by Abby Haddican.

branding Packaging mexico body care


O que é o Galant?



Uma ferramenta para criativos como você, que ajuda a estabelecer processos e administrar:

Clientes + Orçamentos + Projetos + Calendário + Arquivos + Ingresos + Despesas

Te ajudamos a manter sua empresa rentável proporcionando informação detalhada das margens dos projetos baseado em gastos e uso do tempo da equipe, para que possas aprender a cobrar adequadamente cada serviço.

Experimente 30 dias grátis